Case Study: Leviton Provides Advanced Lighting System to
Morongo Casino Resort and Spa
Flexible Programming In Record Time
Like the brightly-colored desert flowers that roar to life after a rainstorm in this picturesque locale 20 miles
west of Palm Springs, the new $250 million 27–story Morongo Casino Resort and Spa roared to life on a tightly
managed yet aggressive construction schedule of only 18 months. In the same space of time, an advanced
lighting control system was installed to put the bloom on this rose.
The lighting control system features a dazzling array of distributed intelligence over a network backbone
that brings power, flexibility and reliability to a building that never sleeps. The result is an award-winning
project showcasing dramatic interior and exterior lighting that is the perfect complement to the picturesque
mountain ranges and sun-streaked vistas of its surroundings.
Click here to view the rest of this story (1.3MB PDF).
For more informatio, contact Leviton Manufacturing Co., Inc., 59-25 Little Neck Parkway, Little Neck, NY 11362-2591, www.leviton.com.
RETURN
TO NEW PRODUCTS
|